Contractor Management in the Water Sector
Contractor approval, site work authorisation and method statement approval are the backbone of contractor control in the water sector. This paper explains why managing them through emails and spreadsheets is no longer enough, and what a single digital framework looks like.
Key takeaways
- Three stages control contractor work on the network: approving the contractor, authorising the site work, and reviewing the method statement.
- Most water companies still run all three through emails, spreadsheets, shared drives and local tools, with each operational area interpreting the process differently.
- That leaves no enforceable chain of control and no live view of what has been approved, where, and to what standard.
- Linking the three stages as conditional digital workflows means work can only proceed when the right controls are genuinely in place.
- Every decision is timestamped and stored, so audit preparation becomes a report, not a reconstruction exercise.
Three stages of contractor governance
Water companies operate under a set of contractor governance processes that are both safety-critical and highly specific to the sector. Three in particular sit at the heart of how work is authorised, controlled, and closed out across the network.
Approve: contractor approval
The structured pre-qualification and ongoing approval process that determines whether a contractor is authorised to work on the network - and under what scope, conditions, and operational areas.
Authorise: site work authorisation
The formal site conditions agreement issued to a contractor for specific work. It links their approval to on-site controls, defining responsibilities, hold points and required conditions before works can proceed.
Review: method statement approval
The structured process for submitting, reviewing and approving contractor RAMS for higher-risk activities. It includes a site hazard checklist and formal sign-off before work commences.
These three stages form the backbone of contractor control in the water sector. When they work well, they create a clear chain of assurance: the right contractor, doing the right work, under the right conditions, with the right method agreed and documented.
The problem is how they are typically managed. Across most water companies today, all three are handled through a combination of emails, spreadsheets, shared drives and local tools - with each operational area often running its own interpretation of the process. The result is inconsistent execution, fragmented audit trails, and no live view of what has been approved, where, and to what standard.
What fragmented management looks like
Consider what happens when a contractor needs to mobilise for a new scope of work. Their approval may need confirming across several operational areas. A site authorisation may be needed for the specific site, with hold points linked to that approval. A method statement may also need approval, involving a site hazard checklist and a RAMS review. Each of these steps touches different people, different systems, and different timelines.
In practice, this often means:
- Approval confirmed over email, with no system record
- Method statements submitted as PDF attachments and reviewed informally, with no version control or enforced sign-off
- Site conditions agreed verbally on site rather than through a structured digital workflow
None of this creates an enforceable, auditable chain of control.
Having an approved document is not the same as having control. Control requires ongoing visibility, enforced dependencies, and a live record of what is actually happening.
Dag Wirdenius, CEO, SiteAssist
The downstream consequences are significant. Without a central contractor register, expired or unapproved contractors can begin work before the issue is caught. Without an enforced authorisation workflow, conditions can be unilaterally changed without a revised approval. Without a digital review process, method statements can be accepted without the right people reviewing them - or the site hazard checklist being formally completed. When an incident occurs, or when Ofwat or the HSE begin an audit, reconstructing the approval chain from emails and spreadsheets is both time-consuming and unreliable.
One digital framework for all three stages
SiteAssist connects contractor governance, method statement approval and site conditions management into one integrated platform. Rather than treating these stages as separate administrative tasks managed across different systems, SiteAssist enforces them as linked, conditional workflows - so that work can only proceed when the right controls are genuinely in place.
The framework has three components, each with a defined digital workflow.
Workflow 1: Contractor register and approval
The Contractor Register is the foundation. Before any work can be authorised, the contractor must hold a valid approval within SiteAssist. The register manages the full lifecycle of contractor approval - from initial pre-qualification through to active monitoring and renewal.
- Basic information. Capture contractor details, core competencies and initial compliance documentation.
- Compliance review. Assess health and safety, environmental and governance documentation against required standards.
- Contractor approval. Formally approve the contractor for defined scopes and operational areas.
- Active monitoring. Track performance, renewals, audits and ongoing compliance during delivery.
- Renewal workflow. Reassess at expiry, renew approval, or suspend or remove based on performance.
Workflow 2: Site work authorisation
Once a contractor is approved, they can submit a work request for a specific scope. SiteAssist enforces the full authorisation lifecycle - from initial review through to formal acceptance by the contractor and final closeout - all linked to the contractor's approval.
- Work request. The contractor submits a digital work request via SiteAssist, outlining scope and location.
- Operational review. The operational reviewer assesses completeness, validates scope and decides if an authorisation is required.
- Issue authorisation. The authorised party issues the authorisation, defining required controls, conditions and responsibilities. The contractor's approval is linked.
- Contractor acceptance. The contractor digitally reviews and accepts the authorisation, confirming the conditions of work.
- Closeout. Once works are complete, the authorisation is formally closed, creating a full audit trail.
Workflow 3: Method statement approval
For higher-risk activities, SiteAssist manages the full method statement process - from initial work request through site hazard checklist, RAMS submission and review, to formal approval and closeout. The operational team retains full control at every step, with enforced digital dependencies preventing progression without the correct approvals.
- Work request. The contractor submits a digital work request via SiteAssist, outlining scope and location.
- Operational review. The operational team reviews the request and decides whether a method statement is required.
- Site hazard checklist. The operational team issues the site hazard checklist to the contractor's representative.
- RAMS review. The contractor prepares and submits the full RAMS. It is reviewed and approved against the checklist.
- Approval and closeout. Approval is issued remotely. On completion, the record is formally closed and the audit record is complete.
What this delivers
When all three stages run through a single connected system, the benefits compound across the business.
- Single source of truth. One platform holds the contractor register, every site authorisation and every method statement approval - no separate spreadsheets, email threads or local tools.
- Real-time visibility. Central governance teams and operational managers can see live status across all contractor approvals, live authorisations and outstanding method statement sign-offs at any time.
- Enforced dependencies. Work cannot be authorised if a contractor's approval has lapsed. A site authorisation cannot be issued without a valid approval. A method statement cannot be signed off until the RAMS is formally reviewed. The system prevents shortcuts.
- Faster mobilisation. Structured digital workflows replace email chains and informal coordination - reducing the time from work request to authorisation without compromising on governance.
- Audit-ready by default. Every approval decision, every version of a method statement and every contractor acceptance is timestamped and stored. Audit preparation becomes a report, not a reconstruction exercise.
Proven results
The value of this approach is best illustrated by real-world outcomes. Two examples from UK infrastructure show what happens when fragmented coordination is replaced with a single enforced system.
Balfour Beatty, group-wide
- 62% reduction in service strikes over three years
Read the Balfour Beatty case study
Balfour Beatty VINCI, HS2 Area North
- 97% reduction in utility high-potential incidents, from 12 in a year to 1
- 44,000 permits issued through the platform
- 3,600 users across the programme
Read the BBV HS2 Area North case study
These results were not achieved by adding more people to the process. They were achieved by replacing fragmented, informal coordination with a single enforced system - one where work could only proceed when the right controls were genuinely in place, and where each organisation had a live view of what was happening across its sites.
The same architecture is directly applicable to the water sector. These three stages are the control layer. SiteAssist is the system that makes that control layer enforceable, visible, and auditable at scale.
See it in a live system
SiteAssist has built specific digital workflows for each of these stages, designed around how water companies actually manage contractor governance. We are happy to walk you through a demonstration tailored to your organisational structure and current processes. Get in touch at info@siteassist.com, or explore the platform and case studies.
About SiteAssist
SiteAssist is a Control of Works platform for high-risk environments. We provide real-time visibility and control over safety-critical processes - connecting contractor registers, permit workflows, inspections and registers into a single live system. SiteAssist is trusted by Balfour Beatty, Skanska, Morgan Sindall, MWH Treatment, VolkerWessels and others across the UK's largest infrastructure programmes. Certified to ISO/IEC 27001:2022 and Cyber Essentials Plus.