Pumping Concrete
Solution

Concrete Pumping Permit Software

A digital permit for concrete pumping with hold points for clearing blockages, plant and personnel checks, and links to your pumping management plan.

29,000+
People using SiteAssist
1,100+
Projects
21 sec
Average in-app support response time

    Concrete pumping combines heavy plant, pressurised lines and tight pour schedules. SiteAssist manages it with a permit tailored to the location and the type of pump, so the checks that matter are completed before and during the pour.

    At a glance

    • Digital hold points for clearing blockages safely.
    • The concrete pumping management plan linked to the permit.
    • Checks specific to the plant, equipment and people involved.
    • Links to the temporary works permit for outrigger pads.
    • A timestamped record of each step.

    Why concrete pumping needs its own controls

    The serious risks in pumping are well known: line blockages cleared under pressure, hose whip, boom movement near people or overhead services, and pump stability on its outriggers. These risks peak at moments when the team is under pressure to keep the pour moving.

    A general permit to work does not ask the right questions at those moments. A blockage is exactly when a stop and a deliberate check are needed.

    How SiteAssist controls concrete pumping

    Hold points for blockages

    Clearing a blockage is a hold point in the permit. The steps in your procedure have to be confirmed before work resumes, and the event is recorded.

    Linked management plan

    The concrete pumping management plan is attached to the permit, so the operator and supervisor work from the approved arrangement for that pour.

    Plant, equipment and personnel checks

    The permit asks questions specific to the pump type and set-up, and can check operators and equipment against your registers.

    Outrigger pads and temporary works

    Where outrigger pads or other temporary works are needed, the pumping permit can require the temporary works permit to be in place first.

    Who it is for

    Concrete pump operators, pour supervisors, site managers and temporary works coordinators.

    Frequently asked questions

    Can the permit differ between a boom pump and a static pump?

    Yes. Conditional logic changes the questions and evidence required depending on the plant type and location.

    Is the pumping management plan stored with the permit?

    Yes. It is linked to the permit so it is available at the point of work.

    See concrete pumping permits in action

    Request a demo using the button at the top of this page, explore the platform, or read the FAQ.

    Dark gray close or cancel icon with an X shape centered inside a square with rounded corners.
    Request a demo
    Find out how we can help
    you achieve your goals.
    Thank you! Your request has been received!
    Oops! Something went wrong while submitting the form.