    Electrical and mechanical safe systems of work depend on one thing being true: the plant is isolated when the permit says it is. SiteAssist manages isolation and energisation as a controlled process, with photo verification of locks and a live view of isolation status.

    At a glance

    • Isolation and energisation managed as a step-by-step digital process.
    • AI padlock detection verifies that isolations are physically in place.
    • Close-outs confirmed at the location of the work.
    • Digital mimic boards show isolation status, mirroring the physical board.
    • Access restricted to authorised persons.

    Why isolations need verification

    The Electricity at Work Regulations 1989 require a safe system of work for work on or near electrical systems. Mechanical isolations carry the same need: stored energy has to be controlled before anyone starts work, and plant must not be re-energised until everyone is clear.

    Paper permits and physical boards rely on people keeping them in step with the plant. A permit can show an isolation that was never applied, or one that has already been removed.

    How SiteAssist controls ESSW and MSSW

    Isolation and energisation as a process

    Each stage, from request and isolation through to work, clearance and energisation, has to be completed in order. Hold points stop the permit moving forward until the previous step is confirmed.

    AI padlock detection

    Photos of isolation points are checked by computer vision for padlocks. If a lock is not detected, a warning is raised, so an isolation is evidenced and not assumed.

    Digital mimic boards

    Mimic boards show which circuits or plant items are isolated and under which permit, so the authorised person and the site office share the same view.

    Geolocated close-outs

    Close-out is recorded at the point of work, with time and location, before energisation can proceed.

    Linked permits

    Other permits, such as confined space entry, can require an isolation permit to be active first.

    Who it is for

    Authorised electrical and mechanical persons, safety engineers and maintenance teams in construction, utilities, nuclear and industrial facilities.

    Frequently asked questions

    What do ESSW and MSSW mean?

    Electrical Safe System of Work and Mechanical Safe System of Work. They are the procedures and permits used to isolate, work on and re-energise electrical and mechanical plant safely.

    How does padlock detection work?

    The person applying the isolation takes a photo. SiteAssist's computer-vision models check the image for a padlock and raise a warning if one is not found.

    See isolation permits in action

    Request a demo using the button at the top of this page, explore the platform, or read the FAQ.

    Dark gray close or cancel icon with an X shape centered inside a square with rounded corners.
    Request a demo
    Find out how we can help
    you achieve your goals.
    Thank you! Your request has been received!
    Oops! Something went wrong while submitting the form.